Moyie Lake FIM 2020
Download: fim_moyie_lake_2020_update_apr_2021.geojson
This is the GeoJSON version of the data available to the public from the FIM survey carried out in 2020. The data was transformed by Foundry Spatial from the raw data.
Resource metadata
Field | Value |
Data last updated | May 11, 2021 |
Metadata last updated | August 11, 2022 |
Created | May 11, 2021 |
Format | GeoJSON |
License | CC-BY-NC-SA-4.0 |
Data collection info | Data collection was undertaken using the FIM methods available at the time of the survey. A QA/QC process was carried out with the QA/QC protocol developed by Ecoscape Environmental Consultants Ltd. |
Data processing | The data processing of the QA/QC applied to all the FIMP datasets involves the use of an R script developed by Ecoscape Environmental Consultants Ltd. This script looks at various naming conventions and ranges of values and raises flags and errors. The last QA/QC carried out in March 2021. |
Data type | non-lab |
Datastore active | False |
Datastore contains all records of source file | False |
Has views | True |
Hash | 8c304ccde22d6b948a1cea3935c943a7 |
Id | 5d20c398-d6d3-406d-83f5-a0e095b1170d |
Mimetype | application/geo+json |
Package id | 54a4d99b-70a4-4923-916a-5516e9b803dd |
Position | 0 |
Resource citation | Wood Canada Ltd. 2021. Moyie Lake Foreshore Integrated Management Planning - 2021. Report Prepared for Living Lakes Canada, Nelson, BC. 43 pp. + 6 App. https://doi.org/10.48511/PPVD-V474 |
Resource data disclaimer | No warranty or guarantee exists that the information is accurate, complete, current, or suitable for any purpose. The individual user must confirm the accuracy of the data and whether it will be appropriate for their purpose. |
Resource location | Shores of Moyie Lake |
Size | 814.5 KiB |
State | active |
Url type | upload |
Waterhub certified | Certified |
Waterhub grade | Technical Research Grade |
Citation (Required) | Wood Canada Ltd. 2021. Moyie Lake Foreshore Integrated Management Planning - 2021. Report Prepared for Living Lakes Canada, Nelson, BC. 43 pp. + 6 App. https://doi.org/10.48511/PPVD-V474 |
Resource Location | Shores of Moyie Lake |
Data Collection Information | Data collection was undertaken using the FIM methods available at the time of the survey. A QA/QC process was carried out with the QA/QC protocol developed by Ecoscape Environmental Consultants Ltd. |
Data Processing | The data processing of the QA/QC applied to all the FIMP datasets involves the use of an R script developed by Ecoscape Environmental Consultants Ltd. This script looks at various naming conventions and ranges of values and raises flags and errors. The last QA/QC carried out in March 2021. |
Data Disclaimer | No warranty or guarantee exists that the information is accurate, complete, current, or suitable for any purpose. The individual user must confirm the accuracy of the data and whether it will be appropriate for their purpose. |
Water Hub Data Grade | Technical Research Grade |
Date of Most Recent Water Hub QA/QC | |
Loading Status | |
Datastore Status | |
Data type | General |
Site
No data available
Parameter
No data available